Guides

Roofing code and estimating guides

The code sections, manufacturer rules and quantity math behind the line items of a roof scope. Short answers first, sources at the end.

Drip Edge Code Requirements (IRC R905.2.8.5)

Is drip edge required on a shingle roof? What IRC R905.2.8.5 says about eaves, rakes, laps, fastening and underlayment order – with the quantity rule for estimates.

Starter Strip Requirements for Shingle Roofs

When is a starter strip required? How IRC R905.1 makes manufacturer instructions enforceable, eaves vs. rakes, and how to count starter in an estimate.

Ice and Water Shield Code (IRC R905.1.2 Ice Barrier)

IRC R905.1.2 ice barrier: which jurisdictions require it, how far it extends (24 inches inside the exterior wall) and how valleys are handled.

Roofing Underlayment Code Requirements (IRC R905.1.1)

IRC R905.1.1 underlayment requirements for asphalt shingles: ASTM types, single vs. double layer by slope, and what that means for the estimate.

Valley Flashing Code (IRC R905.2.8.2)

IRC R905.2.8.2 valley linings for asphalt shingle roofs: 24-inch metal for open valleys, 36-inch lining for closed valleys, and how to quantify them.

Step Flashing and Kick-Out Flashing Code

Sidewall flashing under IRC R905.2.8.3 (step or continuous, 4 x 4 inches) and the kick-out diverter of IRC R903.2.1 – with estimate quantities.

Chimney Cricket Code (IRC R903.2.2 Crickets and Saddles)

IRC R903.2.2: a cricket or saddle is required on the ridge side of any chimney or penetration more than 30 inches wide. What it means for the roof scope.

How Many Layers of Shingles Are Allowed? Roof Overlay Code

IRC R908 roof replacement and recover rules: tear-off to the deck, when a recover (overlay) is not permitted, and what the second layer means for an estimate.

Shingle Nailing Pattern and Roofing Nail Code

IRC R905.2.5 and R905.2.6: roofing nail specs, at least 4 fasteners per strip shingle, and when 6-nail high-wind application applies.

Roof Ventilation Code Requirements (IRC R806)

IRC R806 attic ventilation: net free vent area 1/150 of the attic floor, the 1/300 exception, and how vents appear in a roof replacement scope.

Roof Waste Factor: How Much Waste for Shingles?

How to choose the shingle waste factor for a roof estimate: measurement report waste tables, gable vs. hip rules of thumb, and rounding to full bundles.

Roof Pitch Factor Table and Roofing Squares Calculator

Roof pitch multiplier table from 1/12 to 18/12, how to convert footprint area to sloped area and squares, and where steep charges start.

Hip and Ridge Cap Shingles: Requirements and Quantities

Hip and ridge cap shingles per manufacturer instructions, cut three-tab vs. dedicated cap products, and how to count linear feet.

Overhead and Profit (O&P) on Roofing Estimates

What overhead and profit (O&P) means on a roofing estimate, the common 10 % + 10 % convention, and how contractors document trade coordination – without coverage opinions.

How to Supplement a Roof: Process and Documentation

A step-by-step process for documenting missing items in the scope of your own roofing work: compare line by line, photo IDs, code sections and manufacturer instructions.

Roof Supplement Documentation Checklist

The documentation checklist we use before a roof scope package goes out: measurements, photos per slope, penetrations, flashings, code adoption and installation sheets.

Start 3 free cases