Roof waste factor: how to set it
Use the waste table of the measurement report where one is provided (it is based on the actual cuts). Without one, common rules of thumb are about 10 % for simple gable roofs and about 15 % for hip roofs, more for cut-up roofs. Then round up to full bundles (1/3 square).
Why waste varies
Waste comes from cuts at hips, valleys, rakes, dormers and penetrations. A plain gable roof has few cuts; a hip roof with valleys and dormers has many.
How we calculate it
- Roof area (sloped, not footprint) from the report, in squares.
- Waste percentage from the report’s waste table, or the rule for the roof form.
- Area × (1 + waste), rounded up to the next 1/3 square, because shingles are bought in bundles.
- Hip and ridge cap, starter and underlayment are separate items and not part of the shingle waste.
Example
28.0 SQ gable roof, 10 % waste: 28.0 × 1.10 = 30.8 SQ → 31.0 SQ (full bundles).
Codes are adopted by states, counties and cities, often with amendments. The edition and amendments adopted where the house stands are what count – section numbers here follow the 2021 IRC model code. This guide is general information, not legal advice.
Let us document it for every job
Roofpol Unlimited: line items, quantities and the code and manufacturer support – $1,000 a month, unlimited, 3 test cases free.
Related
- Roofing Takeoff Services
- Roof Estimating Service
- Drip Edge Code Requirements
- Starter Strip Requirements for Shingle Roofs
- Ice and Water Shield Code
- Roofing Underlayment Code Requirements
- Valley Flashing Code
- Step Flashing and Kick-Out Flashing Code
- Chimney Cricket Code
- How Many Layers of Shingles Are Allowed? Roof Overlay Code