Step flashing and kick-out flashing code
Where a shingle roof meets a sidewall, base flashing must be continuous or step flashing at least 4 inches high and 4 inches wide (IRC R905.2.8.3, 2021). A diverter (kick-out) flashing is required where the eave of a sloped roof meets a sidewall (IRC R903.2.1).
Sidewall flashing
- Continuous or step flashing, at least 4 in. × 4 in., directing water onto the roof or into the gutter.
- Where siding is present, the vertical leg runs continuously under the siding – which is why siding at the wall line often has to be detached and reset.
- Older editions (2012/2015) say “step-flashing method”.
Kick-out flashing
IRC R903.2.1 requires flashing that diverts water away from where the eave of a sloped roof intersects a vertical sidewall. It is counted per location (EA).
Quantity
Sidewall length in LF from the measurement report; headwall (apron) flashing separately. Add siding or trim detach and reset only where photos show it is needed to install the flashing.
Codes are adopted by states, counties and cities, often with amendments. The edition and amendments adopted where the house stands are what count – section numbers here follow the 2021 IRC model code. This guide is general information, not legal advice.
Sources
- ICC Digital Codes – 2021 International Residential Code, Chapter 9 Roof Assemblies (free read access)
- Installation instructions of the shingle line installed (GAF, Owens Corning, CertainTeed, IKO, Atlas, Malarkey publish them on their websites)
Let us document it for every job
Roofpol Unlimited: line items, quantities and the code and manufacturer support – $1,000 a month, unlimited, 3 test cases free.
Related
- Roof Supplement Service
- Storm Damage Estimating
- Drip Edge Code Requirements
- Starter Strip Requirements for Shingle Roofs
- Ice and Water Shield Code
- Roofing Underlayment Code Requirements
- Valley Flashing Code
- Chimney Cricket Code
- How Many Layers of Shingles Are Allowed? Roof Overlay Code
- Shingle Nailing Pattern and Roofing Nail Code