Roof scope documentation checklist

Short answer

Before a roof scope goes out: complete measurement report, photos of every slope and test square, every penetration and flashing, edge metal, the deck during tear-off, the installation sheet of the installed product and the local code adoption.

Measurements

  • Measurement report (full PDF) or a sketch with all edge lengths and pitches
  • Pitch per face, stories, number of existing layers
  • Waste table, if the report provides one

Photos

  • Overview of every slope; test squares marked
  • Every penetration: pipe jacks, vents, chimney (with width), skylights, satellite dish
  • Edges: eave and rake metal, starter course, valleys, sidewalls and headwalls, kick-out locations
  • Soft metals and exterior: gutters, siding at wall lines, window wraps and screens
  • Deck condition during tear-off, with measured areas if decking is replaced

Documents

  • Installation instructions of the shingle, starter, cap and underlayment products
  • Local code adoption (edition and amendments) and Table R301.2 values
  • Permit, or written confirmation that none is required
  • The existing estimate, for the line-by-line comparison

Codes are adopted by states, counties and cities, often with amendments. The edition and amendments adopted where the house stands are what count – section numbers here follow the 2021 IRC model code. This guide is general information, not legal advice.

Sources

Let us document it for every job

Roofpol Unlimited: line items, quantities and the code and manufacturer support – $1,000 a month, unlimited, 3 test cases free.

Start 3 free cases See a sample package

Related

Start 3 free cases